PERMIT TO WORK

Training: PTW

HRDC Register No.: 1000185448

Duration: 1 Day

Program

Permit To Work (PTW) Training

Duration

1 Day

Target

Site managers, project managers, maintenance managers, maintenance personnel, contract managers, operational staff and personnel who are to work under a PTW system.

Rationale

A Permit to Work should be used for all high risk work activities where existing controls have not reduced the risks to acceptable levels. Additional risk controls will be developed and implemented through the Permit to Work process (procedure) to ensure that the risks are reduced to acceptable levels. Often, a Permit to Work is used for non-routine work, A "non-routine" task is any task that is not described in established procedures and which involves hazardous work that must be controlled to reduce the risks to acceptable levels.

Objectives

By the end of this training program delegates will be:
• Aware of the roles & responsibilities of each party in PTW System
• Able to identify & assess hazards and associated risks
• Able to control, reduce or eliminate the risks through formalised risk assessment systems
• Able to effectively coordinate, monitor & control work
• Able to respond appropriately to changes in work condition
• Able to control work safely through effective communication & handover at various stages of the work
• Able to demonstrate competency on PTV/ requirements compliance

Course Contents

1. Overview
2. Roles & Responsibilities
3. Permit To Work (PTW) Process
 • Requisition
 • Hazards/Hazardous Activities
 • Worksite Preparation/Precautions
 • Personal Protective Equipment (PPE)
 • Supporting Certificates / Documents
 • Joint Site Visit Before Work Start 1 Approval
 • Revalidation
 • Closed
4. PTW System Audit

Entry Requirement(s)

N/A

Methodology

The delivery has a balance of lectures, workshops & video presentation to assist participants to interpret the OSH requirements in practical situations, together with the questions & answer sessions.

Number of Participants

Maximum 20 pax per session

Training info

Program

Permit To Work (PTW) Training

Duration

1 Day

Target

Site managers, project managers, maintenance managers, maintenance personnel, contract managers, operational staff and personnel who are to work under a PTW system.

Rationale

A Permit to Work should be used for all high risk work activities where existing controls have not reduced the risks to acceptable levels. Additional risk controls will be developed and implemented through the Permit to Work process (procedure) to ensure that the risks are reduced to acceptable levels. Often, a Permit to Work is used for non-routine work, A "non-routine" task is any task that is not described in established procedures and which involves hazardous work that must be controlled to reduce the risks to acceptable levels.

Objectives

By the end of this training program delegates will be:
• Aware of the roles & responsibilities of each party in PTW System
• Able to identify & assess hazards and associated risks
• Able to control, reduce or eliminate the risks through formalised risk assessment systems
• Able to effectively coordinate, monitor & control work
• Able to respond appropriately to changes in work condition
• Able to control work safely through effective communication & handover at various stages of the work
• Able to demonstrate competency on PTV/ requirements compliance

Course Contents

1. Overview
2. Roles & Responsibilities
3. Permit To Work (PTW) Process
 • Requisition
 • Hazards/Hazardous Activities
 • Worksite Preparation/Precautions
 • Personal Protective Equipment (PPE)
 • Supporting Certificates / Documents
 • Joint Site Visit Before Work Start 1 Approval
 • Revalidation
 • Closed
4. PTW System Audit

Entry Requirement(s)

N/A

Methodology

The delivery has a balance of lectures, workshops & video presentation to assist participants to interpret the OSH requirements in practical situations, together with the questions & answer sessions.

Number of Participants

Maximum 20 pax per session

PERMIT TO WORK

Training: PTW

HRDC Register No.: 1000185448

Duration: 1 Day

Training info

Permit To Work (PTW) Training
Permit To Work (PTW) Training
N/A
1 Day
Site managers, project managers, maintenance managers, maintenance personnel, contract managers, operational staff and personnel who are to work under a PTW system.
A Permit to Work should be used for all high risk work activities where existing controls have not reduced the risks to acceptable levels. Additional risk controls will be developed and implemented through the Permit to Work process (procedure) to ensure that the risks are reduced to acceptable levels. Often, a Permit to Work is used for non-routine work, A “non-routine” task is any task that is not described in established procedures and which involves hazardous work that must be controlled to reduce the risks to acceptable levels.
By the end of this training program delegates will be:
• Aware of the roles & responsibilities of each party in PTW System
• Able to identify & assess hazards and associated risks
• Able to control, reduce or eliminate the risks through formalised risk assessment systems
• Able to effectively coordinate, monitor & control work
• Able to respond appropriately to changes in work condition
• Able to control work safely through effective communication & handover at various stages of the work
• Able to demonstrate competency on PTV/ requirements compliance
By the end of this training program delegates will be:
• Aware of the roles & responsibilities of each party in PTW System
• Able to identify & assess hazards and associated risks
• Able to control, reduce or eliminate the risks through formalised risk assessment systems
• Able to effectively coordinate, monitor & control work
• Able to respond appropriately to changes in work condition
• Able to control work safely through effective communication & handover at various stages of the work
• Able to demonstrate competency on PTV/ requirements compliance
1. Overview
2. Roles & Responsibilities
3. Permit To Work (PTW) Process
 • Requisition
 • Hazards/Hazardous Activities
 • Worksite Preparation/Precautions
 • Personal Protective Equipment (PPE)
 • Supporting Certificates / Documents
 • Joint Site Visit Before Work Start 1 Approval
 • Revalidation
 • Closed
4. PTW System Audit
The delivery has a balance of lectures, workshops & video presentation to assist participants to interpret the OSH requirements in practical situations, together with the questions & answer sessions.
Maximum 20 pax per session